Similar to This
Previous
Along the Mattigtalbahn railway line: 29 level crossings closed: BRAUNAU DISTRICT. 63 level crossings were assessed, 34 of which are technically secured.
nachrichten.at/oberoesterreich/innviertel/entlang-der-mattigtalbahn-29-eisenbahnkreuzungen-geschlossen;art70,4191806

Paid articlePaywallWork along the Mattigtalbahn railway line: Rail replacement bus service from July 13 to September 4 - | Braunau
meinbezirk.at/braunau/c-motor/schienenersatzverkehr-von-13-juli-bis-4-september_a8777910

Car collided with a regional train of the Mattigtalbahn railway at a level crossing in Burgkirchen
tips.at/nachrichten/braunau/blaulicht/727889-auto-auf-bahnuebergang-in-burgkirchen-mit-regionalzug-der-mattigtalbahn-kollidiert
Important milestone reached in the electrification of the Mattigtalbahn railway: BRAUNAU DISTRICT. The modernization and electrification of the Mattigtalbahn ...
tips.at/nachrichten/braunau/wirtschaft-politik/724885-wichtiger-meilenstein-in-der-elektrifizierung-der-mattigtalbahn-erreicht
Modernization: These are the measures the Austrian Federal Railways (ÖBB) are planning in Lower Austria in 2026
noen.at/niederoesterreich/wirtschaft/bahnausbau-modernisierung-diese-massnahmen-planen-die-oebb-2026-in-noe-503543299

Construction progress in pictures: Overpass in Mattighofen is under construction - | Braunau
meinbezirk.at/braunau/c-lokales/ueberfuehrungsbauwerk-in-mattighofen-ist-im-entstehen_a7458850

Next