News on this topic
Similar to This
New Neckarsteg in Bad Cannstatt open for pedestrians and cyclists: The new temporary Neckarsteg in Stuttgart Bad Cannstatt is open. Direct connection for ...
kessel.tv/neuer-neckarsteg-in-bad-cannstatt-geoeffnet-fuer-fuss-und-rad/
New Neckarsteg in Bad Cannstatt open for pedestrians and cyclists
Exhibitionist in Bad Cannstatt: Man sexually harasses women - | Witnesses sought: An unknown man sexually harassed two women near the Rosenstein Bridge on ...
stuttgarter-nachrichten.de/lokales/stuttgart/exhibitionist-in-bad-cannstatt-mann-belaestigt-frauen-sexuell-zeugen-gesucht-79380916.html
Exhibitionist in Bad Cannstatt: Man sexually harasses women - | Witnesses ...
New soccer court opened at the Rosenstein Bridge in Bad Cannstatt: The city of Stuttgart has opened a new soccer court at the Rosenstein Bridge in Bad Cannstatt.
stuttgart.de/service/aktuelle-meldungen/2026/august/neuer-soccercourt-an-der-rosensteinbruecke-in-bad-cannstatt-eroeffnet
New soccer court opened at the Rosenstein Bridge in Bad Cannstatt
Giant crane lifts into place temporary Rosenstein Bridge: A 1,000-ton crane lifts the temporary Rosenstein Bridge into place in Stuttgart ...
kessel.tv/riesenkran-hebt-provisorische-rosensteinbruecke-ein/
Giant crane lifts into place temporary Rosenstein Bridge
New Neckarsteg in Bad Cannstatt open for pedestrians and cyclists: The new temporary Neckarsteg in Stuttgart Bad Cannstatt is open. Direct connection for ...
kessel.tv/neuer-neckarsteg-in-bad-cannstatt-geoeffnet-fuer-fuss-und-rad/
New Neckarsteg in Bad Cannstatt open for pedestrians and cyclists
Key FactsTemporary Neckar Bridge Boosts Pedestrian Access
Dec 12, 2025 · Reading time: ~30 sec.
Summary created with AI assistance · Source: kessel.tv
  • The temporary Neckar Bridge at the former Rosenstein Bridge location links Bad Cannstatt’s old town directly to the Neckarvorstadt district.

  • It was delivered by boat and precisely installed using a giant crane before final surface and railing work was completed.

  • The Wilhelmsbrücke will be closed by the end of 2025 and demolished next year due to severe corrosion damage.

  • A new Wilhelmsbrücke is scheduled for construction from spring 2028 to summer 2029, featuring wider paths and seating areas, costing about ten million euros.
Dilapidated bridges in Stuttgart – Wilhelmsbrücke bridge to be closed this year: The new bridge between Neckarvorstadt and Cannstatter Altstadt is scheduled for ...
cannstatter-zeitung.de/inhalt.marode-bruecken-in-stuttgart-sperrung-der-wilhelmsbruecke-bereits-in-diesem-jahr.3fb2c470-2236-44fa-a54e-f99db94441ea.html
Dilapidated bridges in Stuttgart – Wilhelmsbrücke bridge to be closed this ...
The temporary bridge for Bad Cannstatt is here: The temporary bridge for Bad Cannstatt is here | After a journey of several hours across the Neckar River ...
regio-tv.de/mediathek/video/die-behelfsbruecke-fuer-bad-cannstatt-ist-da/
The temporary bridge for Bad Cannstatt is here
Giant crane lifts into place temporary Rosenstein Bridge: A 1,000-ton crane lifts the temporary Rosenstein Bridge into place in Stuttgart ...
kessel.tv/riesenkran-hebt-provisorische-rosensteinbruecke-ein/
Giant crane lifts into place temporary Rosenstein Bridge