Similar to This
Roadworks from the beginning of November: B478 in Ruppichteroth will be partially closed
ksta.de/region/oberberg/b478-in-ruppichteroth-wird-halbseitig-gesperrt-1407434
Roadworks from the beginning of November: B478 in Ruppichteroth will be ...
Birkenau: Road closure after water main break will take longer than expected.: A major water main break occurred in the Nieder-Liebersbach district of Birkenau ...
wnoz.de/nachrichten/odenwald/birkenau-vollsperrung-nach-wasserrohrbruch-1033227.html
Birkenau: Road closure after water main break will take longer than ...
Decision made on the future of the Birkenau on-demand taxi service: The municipality of Birkenau put the on-demand taxi service out to tender again ...
wnoz.de/nachrichten/odenwald/entscheidung-ueber-die-zukunft-des-birkenauer-ruftaxis-ist-gefallen-1030179.html
Decision made on the future of the Birkenau on-demand taxi service
After the closure of the post office branch – | Where Birkenau residents can now get their parcels
wnoz.de/nachrichten/odenwald/in-birkenau-schliesst-die-postfiliale-in-der-bahnhofstrasse-1028160.html
After the closure of the post office branch – | Where Birkenau residents ...
Due to sewer work: Section of Pforzheimer Talstraße will be completely closed: Pforzheim. Due to work on the sewer system in Talstraße, the street will be ...
pz-news.de/pforzheim_artikel,-Wegen-Kanalarbeiten-Abschnitt-der-Pforzheimer-Talstrasse-wird-komplett-gesperrt-_arid,2350525.html
Due to sewer work: Section of Pforzheimer Talstraße will be completely ...
Birkenau: Two streets partially closed: Residents of Birkenau will face two partial road closures. The first one begins on Wednesday.
wnoz.de/nachrichten/odenwald/birkenau-zwei-strassen-halbseitig-gesperrt-950598.html
Birkenau: Two streets partially closed
Birkenau Mayor Mapplassary comments on the AfD's candidacy: The mayor of Birkenau wants to continue pursuing "objective and fact-based politics" for his ...
wnoz.de/nachrichten/odenwald/birkenauer-buergermeister-mapplassary-aeussert-sich-zum-afd-antritt-933079.html
Birkenau Mayor Mapplassary comments on the AfD's candidacy
Water main break in Weinheim: Birkenauer Talstraße currently partially closed: Traffic is being guided past the construction site on Birkenauer Talstraße via ...
wnoz.de/nachrichten/weinheim-und-bergstrasse/wasserrohrbruch-in-weinheim-birkenauer-talstrasse-aktuell-halbseitig-gesperrt-913840.html
Water main break in Weinheim: Birkenauer Talstraße currently partially ...
Traffic accident: Talstraße in Elspe currently completely closed: After a serious traffic accident, Talstraße is currently completely closed ...
come-on.de/luedenscheid/verkehrsunfall-talstrasse-in-der-elspe-aktuell-voll-gesperrt-94075888.html
Traffic accident: Talstraße in Elspe currently completely closed
Birkenau: "Im Herrengarten" street - | Southern exit will be closed: Renovation of Birkenau's main street: Starting November 10th, the southern exit at ...
wnoz.de/nachrichten/odenwald/birkenau-strasse-im-herrengarten-suedliche-ausfahrt-wird-gesperrt-832875.html
Birkenau:
Weinheim Saukopf Tunnel and Birkenau town center closed simultaneously: When will the Saukopf Tunnel between Weinheim and Birkenau be closed and why maintenance ...
bergstraesser-anzeiger.de/region-bergstrasse_artikel,-bergstrasse-weinheimer-saukopftunnel-und-birkenauer-ortsdurchfahrt-gleichzeitig-gesperrt-_arid,2325871.html
Weinheim Saukopf Tunnel and Birkenau town center closed simultaneously
Weinheim/Birkenau: Cyclist falls and is injured: A cyclist fell on Tuesday evening on Birkenauer Talstraße between Weinheim and Birkenau ...
wnoz.de/nachrichten/weinheim-und-bergstrasse/weinheimbirkenau-radfahrer-gestuerzt-und-verletzt-694994.html
Weinheim/Birkenau: Cyclist falls and is injured
Schriesheim: B 3 is being renovated - | Half-side closure from June 16th: Due to construction work at the B3/Talstraße intersection in Schriesheim ...
wnoz.de/nachrichten/metropolregion/schriesheim-b3-wird-saniert-halbseitige-sperrung-ab-16.-juni-692531.html
Schriesheim: B 3 is being renovated - | Half-side closure from June 16th
DAV Weinheim: Jakobswand closed to climbers: The Jakobswand on the DAV Weinheim site on Birkenauer Talstraße is currently closed to climbers ...
wnoz.de/nachrichten/weinheim-und-bergstrasse/dav-weinheim-jakobswand-fuer-kletterer-gesperrt-687635.html
DAV Weinheim: Jakobswand closed to climbers