News on this topic
Between Waiblingen and Cannstatt - | Another complete closure of the railway line at the end of February: What commuters can expect
cannstatter-zeitung.de/inhalt.zwischen-waiblingen-und-cannstatt-erneute-vollsperrung-der-bahnstrecke-ende-februar-das-kommt-auf-pendler-zu.3bc8bc9a-7942-4e81-a88d-c2060bd82c54.html

Paid articlePaywallSimilar to This
Previous
S-Bahn cancellations from February 24: It will be even worse than expected for S2, S3, S4
zvw.de/rems-murr-kreis/s-bahn-ausf%C3%A4lle-ab-24-februar-f%C3%BCr-s2-s3-s4-kommt-es-noch-h%C3%A4rter-als-gedacht_arid-1053113

Paid articlePaywallLocal transport in Stuttgart - | Renewed S-Bahn closures - | also affecting CMT visitors
stuttgarter-nachrichten.de/inhalt.nahverkehr-in-stuttgart-erneute-s-bahn-sperrungen-auch-besucher-der-cmt-betroffen.90a06730-6019-4aa7-8d0a-9a7d9eda09c1.html

Key FactsStuttgart S-Bahn Disruptions and Bus Replacements 2026
Jan 10, 2026 · Reading time: ~45 sec.
Summary created with AI assistance · Source: stuttgarter-nachrichten.de
Summary created with AI assistance · Source: stuttgarter-nachrichten.de
- Deutsche Bahn is upgrading signaling technology on major S-Bahn routes near Bad Cannstatt, Untertürkheim, and Vaihingen until March.
- From January 13 to 30, Regionalbahn 11 services are suspended and some long-distance trains are rerouted, impacting the S2 line.
- Weekends between January 16 and February 23 see closures on the Stuttgart-Vaihingen to Böblingen and airport lines, replaced by buses and express shuttles.
- Attendees of the CMT travel fair are advised to use trams, while additional restrictions in February and March further disrupt commuter services.
To relieve the replacement bus service, Deutsche Bahn already advises switching to the U6 light rail line towards Fildern at Stuttgart main station.— Deutsche Bahn advises switching to the U6 light rail line to relieve the replacement bus service.
Rail chaos: Details on the next complete closure of the Waiblingen-Cannstatt line starting February 24th
zvw.de/rems-murr-kreis/bahnchaos-die-details-zur-n%C3%A4chsten-vollsperrung-waiblingen-cannstatt-ab-24-2-_arid-1041707

Paid articlePaywallIn February: Waiblingen-Cannstatt train line interrupted again, rail replacement bus service instead of MEX13
zvw.de/rems-murr-kreis/im-februar-zugstrecke-waiblingen-cannstatt-erneut-unterbrochen-sev-statt-mex13_arid-1038929

Paid articlePaywallRail replacement service from Waiblingen: Rail commuters are unimpressed: Aalen–Stuttgart railway line: Commuters report delays and cancellations - | how they ...
schwaebische-post.de/ostalb/aalen/bahnstrecke-aalen-stuttgart-gesperrt-pendler-reagieren-gelassen-94063453.html

Three weeks of S-Bahn closure between Bad Cannstatt and Fellbach: Three weeks of closure between Bad Cannstatt and Fellbach. Replacement buses ...
kessel.tv/drei-wochen-s-bahn-dicht-zwischen-bad-cannstatt-und-fellbach/

Key FactsDecember S-Bahn Line Closure with Color-Coded Buses
Dec 2, 2025 · Reading time: ~30 sec.
Summary created with AI assistance · Source: kessel.tv
Summary created with AI assistance · Source: kessel.tv
- Extensive maintenance and upgrades cause a full shutdown of the rail link between Bad Cannstatt and Fellbach during December.
- Lines S1 to S3 run in separate sections at half-hour intervals, whereas S4 service is halted entirely and substituted by buses.
- A new color-coded bus replacement system is introduced by Deutsche Bahn to help manage high passenger volumes at key stops.
- Morning rush hours see crowded buses and packed stops despite these measures, making travel challenging for commuters.
News blog on the rail closure in the Rems-Murr district: What you need to know about the rail replacement bus service
zvw.de/rems-murr-kreis/newsblog-zur-bahnsperrung-im-rems-murr-kreis-das-m%C3%BCssen-sie-zum-sev-wissen_arid-1028154

Paid articlePaywallBetween Fellbach and Bad Cannstatt - | Massive disruptions - | what the three-week complete closure means for commuters
cannstatter-zeitung.de/inhalt.zwischen-fellbach-und-bad-cannstatt-massive-einschraenkungen-was-die-dreiwoechige-vollsperrung-fuer-pendler-bedeutet.b88f52c9-b9d7-49f1-a96f-5baf0c5144af.html

S-Bahn chaos at VfB's game against PSG?: For the "final" for progress in the Champions League on Wednesday at 9 p.m. against Paris St. Germain ...
stuttgarter-zeitung.de/inhalt.s-bahn-stuttgart-vfb-psg-champions-league.94641f11-1ccb-460c-a47c-142db8ddef03.html

S-Bahn in Stuttgart - | Delays and cancellations on S2 and S3 due to signal failure
cannstatter-zeitung.de/inhalt.s-bahn-in-stuttgart-verspaetungen-und-fahrtausfaelle-bei-s2-und-s3-wegen-signalstoerung.6e2b9534-a1e2-4bbc-82b9-921e82087368.html

No S-Bahn between Bad Cannstatt and the main station - "It's worse than the VfB game"
stuttgarter-nachrichten.de/inhalt.keine-s-bahn-zwischen-bad-cannstatt-und-hauptbahnhof-es-ist-schlimmer-als-beim-vfb-spiel.8187067d-0d87-45c8-b476-dbf3fe49ad4e.html

Key FactsCommuters Struggle with S-Bahn Suspension Until Saturday
Nov 20, 2024 · Reading time: ~30 sec.
Summary created with AI assistance · Source: stuttgarter-nachrichten.de
Summary created with AI assistance · Source: stuttgarter-nachrichten.de
- No S-Bahn service operates between Bad Cannstatt and Stuttgart Hauptbahnhof until Saturday, causing significant distress for commuters.
- An alternative bus service has been established, but many experience overcrowded trains and lengthy wait times.
- Commuters express stress and inconvenience due to the changes, leading to delays and frustration.
- Replacement buses start outward and take a detour via Wilhelmsplatz, complicating the situation further.
Rail trouble at the weekend: S3 is canceled from Waiblingen - S2 also affected: Train trouble at the weekend: S3 is canceled from Waiblingen - S2 also affected - ...
zvw.de/rems-murr-kreis/bahn-%C3%A4rger-am-wochenende-s3-f%C3%A4llt-ab-waiblingen-aus-auch-s2-betroffen_arid-818020

Paid articlePaywallConstruction work between Stuttgart and Waiblingen: S2 and S3 from May 24th. affected
zvw.de/rems-murr-kreis/bauarbeiten-zwischen-stuttgart-und-waiblingen-s2-und-s3-ab-dem-24-05-betroffen_arid-814057

Paid articlePaywallThis is how the Waiblingen-Stuttgart train closure affects the vocational schools
zvw.de/lokales/waiblingen/so-wirkt-sich-die-bahn-sperrung-waiblingen-stuttgart-auf-die-berufsschulen-aus_arid-656284

Paid articlePaywallRail closure Stuttgart-Waiblingen in the liveblog: Commuter chaos on Monday (15.5.)? - News from the Rems-Murr district - Zeitungsverlag Waiblingen
zvw.de/rems-murr-kreis/bahn-sperrung-stuttgart-waiblingen-im-liveblog-pendler-chaos-am-montag-15-5-_arid-653455

Because of construction noise: residents of the railroad closure Stuttgart-Waiblingen may go to the hotel
zvw.de/rems-murr-kreis/wegen-baul%C3%A4rm-anwohner-der-bahn-sperrung-stuttgart-waiblingen-d%C3%BCrfen-ins-hotel_arid-654604

Paid articlePaywallOndergrondse verbouwing parallel aan spoorwegafsluiting: wegafsluiting in Cannstatt
zvw.de/lokales/fellbach/u-bahn-umbau-parallel-zur-bahn-sperrung-stra%C3%9Fensperrung-in-cannstatt_arid-652996

Paid articlePaywallCannstatt construction site causes upset in Fellbach - 14-day traffic chaos looms at Whitsun
cannstatter-zeitung.de/inhalt.cannstatter-baustelle-sorgt-fuer-verstimmung-in-fellbach-an-pfingsten-droht-14-tage-verkehrschaos.26765680-c7a0-4b84-8594-fa9707f1ed95.html

Deutsche Bahn will present the timetable concept from May
bkz.de/nachrichten/deutsche-bahn-stellt-fahrplankonzept-ab-mai-vor-186191.html

Next
